City of Kinston — Peak-Shaving Generation & Microgrid

Engineer of record for 5–10 MW of peak-shaving generation at Hull Substation, designed for standby and future microgrid operation.

Distribution substation lit up at night
Representative photo
Client
City of Kinston, NC (municipal electric utility)
Status
In progress
Project type
Generation integration, substation engineering & microgrid design
Voltage class
Distribution substation with generation tie-in

Project overview

We’re the engineer of record and lead design engineer for the City of Kinston’s plan to add 5–10 MW of peak-shaving generation at its Hull Substation.

The design addresses immediate peak-demand management and long-term resilience. It’s built for standby operation and potential microgrid islanding, so the city could restore substation feeders on its own if utility supply is lost — with all new equipment fitting inside the existing substation fence.

Highlights

  • Generation integrated into an existing, energized substation
  • Microgrid and islanding capability designed in from day one
  • Protection and control system designed from scratch
  • Municipal project delivery, including public bidding support

Working on something similar?

We’re glad to talk through a project at any stage — including the ones that are still just a one-line on a whiteboard.