NC State University — Centennial Substation Automation

SCADA integration, a new HMI, and an automatic transfer scheme for a 230 kV campus substation after a transformer bank replacement.

Two substation power transformers beside a building
Representative photo
Client
NC State University — Centennial Campus
Status
In progress
Project type
SCADA automation, HMI & automatic transfer scheme
Voltage class
230 kV high side

Project overview

After a failed transformer bank was replaced at NC State’s Centennial Substation, we were brought in to integrate the new transformer and switchgear into the existing SCADA system, build a new HMI operator screen, and develop an automatic transfer scheme.

The scheme switches between redundant transformer banks so every downstream distribution feeder stays energized through a transformer contingency. We’re coordinating commissioning alongside the project’s independent testing contractor.

Highlights

  • Custom IEC 61131-3 structured-text logic for automatic transfer
  • Vendor-agnostic SCADA work across Novatech Orion and Ignition
  • Designed for a campus that can’t afford to go dark
  • Collaborative commissioning with an independent testing firm

Working on something similar?

We’re glad to talk through a project at any stage — including the ones that are still just a one-line on a whiteboard.